Skip to content Skip to left sidebar Skip to footer

Floodplain Development Permit

This permit is used with the condition that the developer/owner will provide certification by a registered Engineer, Architect or Land Surveyor of the “As-Built” lowest floor (including basement) elevation of any new or substantially improved building covered by this permit.  Required before Occupancy Inspection is scheduled.

Floodplain Development Permit