Floodplain Development Permit
This permit is used with the condition that the developer/owner will provide certification by a registered Engineer, Architect or Land Surveyor of the “As-Built” lowest floor (including basement) elevation of any new or substantially improved building covered by this permit. Required before Occupancy Inspection is scheduled.